Enrolling nowNABCEP Fast-Track — four live daysFRI 27 & SUN 29 NOVSUN 6 & 13 DECEnrol now →
Home  /  BPI  /  INFILTRATION & DUCT LEAKAGE

Infiltration & Duct Leakage — no prerequisites, no paper.

BPI states it plainly: “There are no prerequisites to take this exam or become certified.” It is a 90-minute field evaluation and nothing else — the shortest route there is from doing this work to being certified in it.

If you already run blower doors and duct testers for code compliance, this is the certification that matches what you do, and there is remarkably little standing between you and it.

What BPI says about getting in

“There are no prerequisites to take this exam or become certified.” No certificate to buy first, no experience points to assemble, no approval letter to wait for. There is also no written exam at all — the certification requires a practicum evaluation only.

It is the one BPI field credential you can go from standing start to certified on, and the whole of it happens in a 90-minute window.

Book the IDL field exam →

What the certification covers — and what it deliberately does not

BPI is unusually direct about the scope: “This certification is not intended to be a whole house diagnostic, audit or assessment.” It covers three measurements and the analysis of them:

  • Whole house infiltration testing — blower door setup, baseline pressure, CFM50 and ACH50
  • Total distribution system leakage — duct pressurization, manometer placement, pressure-relieving the duct zone, CFM25
  • Distribution leakage to the outside — house configuration, whole house depressurization, and the ASTM E 1554-07 method C approach BPI references

BPI positions it for professionals working on new construction code compliance, and also names retrofit of existing buildings. If what you need is a whole-house audit credential, you want the Building Analyst chain or the Energy Auditor instead — and this page will not pretend otherwise.

What the field exam asks you to do

  1. Set up. Combustion appliances to pilot, registers sealed, interior doors positioned, duct pressurization device attached.
  2. Total leakage. Position the manometer, pressure-relieve the duct zone, sample duct pressure, measure CFM25.
  3. Leakage to outdoors. Configure the house, set up the whole house depressurization device, and adjust both devices for an accurate measurement.
  4. Infiltration. Blower door setup, baseline pressure accounted for, CFM50 measured, ACH50 calculated.
  5. Analysis. Identify leakage areas, calculate CFM per unit of conditioned floor area, and compare the result against the applicable BPI standard.
The exam needs ductwork, and that is not negotiable

BPI voids field exams conducted at sites without ductwork. The whole middle of the evaluation is duct leakage, so a ductless house cannot produce a valid result. We confirm the site before the date for exactly this reason — it is the sort of thing that is a scheduling note beforehand and a wasted day afterwards.

The practical details, from BPI’s handbook

  • Ninety minutes. BPI’s stated limit for the practicum evaluation is one hour and thirty minutes.
  • Eighty-five per cent to pass. Higher than the BA-T’s 70% and the Energy Auditor field exam’s 83%, which is worth knowing before you treat this as the easy one. Fewer barriers to entry is not the same as an easier exam.
  • Open book. Any reference you want; the only thing prohibited is assistance from another person. Scrap paper stays in the room and is destroyed by the proctor.
  • Six attempts in a year, with twelve months from your first exam to complete the certification.
  • Three-year term. Renewal can begin six months before expiry.
  • Recorded. Audio and video, by BPI’s requirement.

Renewing it

Two routes. Pass the IDL field exam again before your certificate expires, or submit a renewal application with fees. BPI also operates a work-experience policy that can waive the field exam for people who have held continuous certification and stayed active in the field — the policy itself lives on BPI’s site and is worth reading before you assume you qualify. An open complaint at expiry blocks renewal, and an unsuccessful renewal attempt ends the current certification immediately.

Why we are standing this one up first

No prerequisites, no written exam, 90 minutes, and a population of Canadian technicians who already own the instruments and already do the work. If a Canadian BPI Test Center is going to be useful to anyone on day one, it is to these people — and it should not have taken a flight to Ohio.

Where these figures come from

Scope, prerequisites, exam length, pass mark, open-book rule, field exam content, term, renewal routes and the ductwork requirement: BPI Infiltration & Duct Leakage Scheme Handbook, revised 9 April 2026. Attempt limits, identification, proctoring and recording: BPI Core Certification Scheme Handbook, revised 9 April 2026. Comparison of pass marks: BPI Building Analyst Technician Scheme Handbook, revised 1 January 2023 and BPI Energy Auditor Certification Scheme Handbook, revised 23 July 2026. Checked against BPI’s published documents on 21 October 2026.

Common questions

Do I need any certificate before the IDL exam?

No. BPI's handbook says there are no prerequisites to take the exam or become certified. It is the only BPI field credential with none.

Is there a written exam?

No. The certification requires a practicum evaluation only — there is no multiple-choice paper at any stage.

How hard is 85%?

Harder than it sounds. It is the highest field-exam pass mark of the certifications we have checked — BA-T is 70% and the Energy Auditor field exam is 83%. Easy to enter is not the same as easy to pass.

Can the exam be done on any house?

No. BPI voids field exams at sites without ductwork, because duct leakage is most of the evaluation. We confirm the site before the date.

Can I bring my own blower door and manometer?

Ask on the booking form. Equipment is one of the things we settle in writing before the date rather than on the morning.

Does it renew without another field exam?

Sometimes. You can pass the field exam again, or apply with fees, and BPI operates a work-experience policy that can waive the field exam for continuously certified people who stay active. Read that policy before relying on it.

Is this the same as being a BPI Building Analyst?

No, and the two are not interchangeable. BPI says this certification is not intended as a whole house diagnostic, audit or assessment. If a programme asks for a Building Analyst or an Energy Auditor, this will not satisfy it.

Related

Where to go next

Book

Book a BPI exam.

The certification, the format, roughly when. We register you, arrange the proctor and confirm the date before you pay.